Week 04 Summary:
Week 05 Summary: Beverly constructed an altimeter circuit and will test its performance shortly.
Week 06 Summary:
SD Presentation: May 16 11-12 PM
Week 07 Summary: Final presentation successful. Much unfinished business remains however
| WEEK | TASK | STATUS | WORTH | GRADE |
| 04 | Working altimeter | LATE | 15% | 10% |
| 05 | Web tutorial | DONE | 5% | 4% (move page to your IRT account) |
| Performance metrics altimeter | NOT DONE | 5% | 0% | |
| Altimeter-STAMP concept write up | DONE | 5% | 4.5% | |
| 06 | Picavet concept write up | DONE | 5% | 0% The submitted document did not discuss conceptually how the Picavet works. |
| 1st Draft Final report | INCOMPLETE | 5% | 1% The submitted document only had additional altimeter information | |
| 07 | Picavet Final equations of motion | DONE | 20% | 17% |
| Practice talk | DONE | 5% | 5% | |
| 08 | ADAMS web tutorial | DONE | 10% | 10% |
| Oral and Final report | DONE | 10% | 10% | |
| 09 | Picavet ADAMS simulation | LATE | 15% | Not demoed as of 05/28/02 |
| WEEK | TASK | STATUS | WORTH | GRADE |
| 04 | BMP with text labels | Not delivered | 5% | 0% |
| 05 | Final mosaic | IN PROGRESS | 10% | 10% Pending more than 4 image stills are used. Final 5%. As of 05/07/02 only 5 images were mosaicked |
| 1st draft web page mosaicing tutorial | DONE | 10% | 9% Move to your IRT account | |
| 06 | Mosaic equations | DONE | 20% | 20% |
| Long/Lat measurements | DONE | 15% | 15% | |
| 07 | 1st draft of mosaicing in Final report | DONE | 5% | 5% |
| Practice talk | DONE | 5% | 5% | |
| 08 | VRML Canoma | LATE | 10% | 0% unless delivered by 05/24/02 |
| Oral and Final report | DONE | 10% | 8.5% | |
| 09 | Canoma web tutorial | - | 10% | TBD |
| WEEK | TASK | STATUS | WORTH | GRADE |
| 04 | Demo Video streaming | WORKS | 10% | 10% |
| Demo 1st draft web tutorial | WORKS | 10% | 10% | |
| Canny edge detector paper | DONE | 2.5% | 2.5% | |
| 05 | Edge detection using canned software | DONE | 10% | 10% |
| 06 | Edge detection in C | DONE | 25% | 22% Pending edge detection theory is given in 1st draft report otherwise 20%. Final 22% |
| 07 | 1st draft of video streaming and edge detection in Final report | DONE | 5% | 5% |
| Practice talk | DONE | 5% | 5% | |
| 08 | C mosaicing progress report | DONE | 2.5% | 2.5% |
| Oral and Final report | DONE | 10% | 10% | |
| 09 | C mosaicing program | LATE | 20% | Not demoed as of 05/28/02 |
| WEEK | TASK | STATUS | WORTH | GRADE |
| 04 | Printout of table draft | DONE | 5% | 5% |
| Vectron clone parts list | INCOMPLETE | 5% | 2% | |
| 05 | Final table printout | DONE | 5% | 5% |
| Vectron concept write up | DONE | 5% | 5% | |
| Free body diagrams, equations | DONE | 15% | 15% adjusted 05/07/02 | |
| Vendors parts numbers for Vectron-clone | DONE | 5% | 3.5% | |
| 06 | Experimental flight data | DONE | 15% | 15% pending a few extra data points added by 05/09/02. 13% otherwise. As of 05/16/02 no extra points were acquired. Final 13% |
| 07 | 3 lb payload Vectron size requirements | DONE | 10% | 8% |
| Practice talk | DONE | 5% | 5% | |
| 08 | Write up to build 3 lb carrying Vectron | LATE | 5% | Show preliminary list by 05/20/02 else face late penalties. Final list due 05/24/02. Final 0% |
| Oral and Final report | DONE | 10% | 10% | |
| 09 | RC helicopter source | - | 5% | TBD |
| UAV papers | EXCUSED | 5% | 5% | |
| 1st draft Vectron-related web page | - | 5% | TBD |